Free online survey, made to measure: +90 532 689 21 46
Bayrakdoor Steel Doors

Ordu Villa Door

Product CodeBD-VK52
Price range$1,250 – $4,150

As of 2026. Varies by dimensions, finish and delivery location; the final quote is issued after a free site survey.

Made-to-measure villa entrance door for Ordu: free online survey, produced in our own factory, installation quoted separately.

Pre-Order & Price Request

This model is made to measure. Leave your request and we'll call you to arrange a site survey.

Product codeBD-VK52

This is here to block automated submissions — it only takes a second.

  • Survey and measurement are free
  • Same-day response
  • Made in our own factory
  • Two-year certificate, workmanship without a time limit
Download this model's PDF spec sheet
Share this model
Worldwide shipping & export
Made in our own factory
Two-year certificate, workmanship without a time limit

What is asked for in a villa door in Ordu?

Villa door demand in Ordu comes from the view houses on the slopes of Altınordu and from coastal homes in Ünye and Fatsa. Detached houses within hazelnut groves form a separate group: there the door usually sits above garden level and the ground is steep. Buyers often want a glazed entrance or side panels, because the view is why the house was bought; the question here is how that glazing is resolved for heat and security. In inland districts such as Gölköy and Mesudiye the winter is harder and demand shifts to a solid, unglazed leaf.

What changes villa door prices in Ordu?

No single item sets the price of a villa door; dimensions, leaf construction and surface all enter the calculation together. Non-standard openings mean a purpose-made frame, and that is the first step in the cost. The second is the leaf: single or double, with or without a side panel or transom. The third is the surface — there is a clear difference between plain paint, timber texture and composite cladding. On the hardware side, stainless specification, the number of locking points and a door closer add to the total. Because everything is made to measure we do not publish a catalogue price. The survey is carried out online and free of charge; once you share the dimensions and a photograph we itemise the quote line by line, so you can see what each item costs. Installation is discussed as a separate item.

Villa door models and surface options

Model families are separated by leaf pattern: panelled classic, cassette-panel, horizontal-louvre and straight-lined contemporary surfaces. Classic patterns cast shadow through carving depth and sit well on stone or rendered facades; louvre and straight-lined surfaces suit newer glass-and-aluminium buildings. In colour, anthracite grey (RAL 7016), off-white and walnut-honey tones are the most requested. All models can be seen together on the villa door models page; every pattern there is built to the same body standard, and what differs between them is the surface and the hardware.

Exterior entrance and composite villa doors

An exterior entrance door solves a different set of problems from an internal one: rain, sun, temperature difference and forced entry. That is why a thermally broken leaf, a double line of gaskets and a threshold profile that directs water outwards are treated as standard on an exterior entrance. Composite-clad options bring a separate advantage at the surface: the cladding layer behaves more stably than paint against UV and moisture, and colour fade progresses more slowly. A composite surface gives a close-to-real timber texture without carrying the maintenance load of timber.

How do conditions in Ordu change the technical choice?

The coastal strip sits in the ISO 9223 C3-C4 range. Rain washes salt off the surface, so build-up is lower than on the Aegean coast; in exchange the surface rarely dries, and that wet time is what governs. On steep ground water runs towards the door rather than pooling in front of it, so the threshold has to meet running water and the fall of the ground matters as much as the door. Where a glazed entrance is wanted, the glass edge is the critical point: if the joint between profile and glass takes in water, the problem shows up in the frame, not the glass. A replaceable glazing gasket, an edge-protected double-glazed unit and a raised threshold are therefore applied together here.

Measurement, production and installation

The process starts with a free online survey: you measure the four corners and both diagonals of the opening and share them with a photograph, and we check the plumb of the frame and the floor level together. Once the measurements are approved the leaf is produced in our own factory — we do not subcontract, so a change of pattern or colour is still possible before production starts. Installation is quoted as a separate item; the frame perimeter is filled with polyurethane and the lock and hinges are adjusted before handover. You can see our coverage in and around Ordu on the Ordu service area page, and reach us for a survey and quote through the contact page.

Maintenance, warranty and spare parts

A steel door is not a maintenance-free product, but what it asks for is simple. Once a year, light oil on the hinges and the lock mechanism, a damp cloth along the gasket line and a fresh-water wash of the surface is enough in most cases. At addresses by the sea, shortening that cycle to six months keeps salt from settling into the paint film. We give a two-year warranty on the body and the welding work and five years on the lock mechanism; the only case outside the warranty is deformation caused by impact or forced entry. On spare parts we keep the cylinder, the handle set and the hinge pin in stock — a door does not stay shut waiting for a part years later.

Frequently asked in Ordu

We want a glazed door for the view — does that weaken security?

Not if the glazed area is laid out correctly. What matters is not the glass itself but the distance from the lock point to the glass: if the glass is close to the lock, someone can reach the handle through a broken pane. So we move the glazing away from the lock line, use laminated security glass and fit a multi-point lock. A side-panel solution also works well — light and view come in while the leaf stays solid.

The garden level is higher than the door — will water be a problem?

On Ordu's sloping ground this is the situation we meet most often. Water does not stand in front of the door, it runs at it, so gaskets and a threshold alone are not enough. A transverse channel drain in front of the door line, or a fall in the ground that takes water away, is needed. On the door side we apply a raised threshold and a drain hole in the lower frame profile. That is why we ask for the floor level and the direction the water comes from along with the photograph when taking measurements.

Specifications

Ürün koduBD-VK52
Hizmet bölgesiOrdu
KanatIsı köprüsü kesilmiş, poliüretan dolgulu
FitilÇift sıra
ÜretimÖlçüye özel

Frequently Asked Questions

What is the lead time for a custom villa door?

Production takes 20-25 days from the day the specification is approved. Custom detailing — carved cladding, oversized leaves, special glass — can extend that, and we confirm the date in writing before starting. Ocean freight time to the destination port is added on top.

How are steel doors packaged for sea freight export?

Each door is crated in a wooden case built to its own dimensions, with edge protection and corner blocks, then strapped to prevent movement inside the container. Full container loading is used for project quantities; single doors and small orders ship as groupage cargo.

What measurements do you need to quote?

The width, height and wall thickness of the rough opening, in millimetres or in inches — whichever your drawings use. Photographs of the opening from inside and outside help us confirm the swing direction and the frame detail. No site visit is needed.

Can you manufacture to imperial (inch) dimensions?

Yes. An opening given as 36 x 80 inches is manufactured to that dimension directly. Nothing is converted to a nearest metric size and rounded, so the door arrives at the size your drawing specifies.

Who installs the door at the destination?

Your own contractor. Every shipment includes an installation drawing and the frame fixing set, and the frame is designed to be set into the opening without special tooling.

What export documents travel with the shipment?

Commercial invoice, packing list and certificate of origin, plus whatever else the customs broker at the destination requires. Documentation is prepared before the container leaves the factory.

Do the doors carry a security class such as RC2 or RC3?

We do not state a resistance class we cannot document. Under EN 1627 a class belongs to one tested configuration, and a door built to your opening is by definition a different configuration. What we do document is the components: the lock, the hardware, the glass and the steel each carry their own manufacturer certificates, European ones included, and we send copies on request.

Which certificates can you provide for a project?

For the materials that go into the door: the certificate of the lock manufacturer, of the stainless hardware, of the laminated glass and of the steel grade, plus the export papers for the shipment itself. Tell us which documents your architect or building authority asks for and we will send what exists before you order.

You May Also Like

Before you decide

Pages where we cover the technical questions most often asked about this model: